Construction

As of 2007, the proposed plans called for the wind farm to be constructed over 5 phases of 11 turbines each, each phase to be completed over a single construction season, lasting from April to October. Plans call for each phase to be fully commissioned and producing electricity by the end of each working season. As of 2007, production was planned to commence in 2011, with the entire development completed by 2013.

Read more about this topic:  Oriel Wind Farm

Famous quotes containing the word construction:

    No construction stiff working overtime takes more stress and straining than we did just to stay high.
    Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)

    No real “vital” character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the author’s personality, developing by internal necessity as much as by external addition.
    —T.S. (Thomas Stearns)

    There’s no art
    To find the mind’s construction in the face:
    He was a gentleman on whom I built
    An absolute trust.
    William Shakespeare (1564–1616)