Detailed List of Projects For 2015
Terminology
- Year Startup: year of first oil. put specific date if available.
- Operator: company undertaking the project.
- Area: onshore (LAND), offshore (OFF), offshore deep water (ODW), tar sands (TAR).
- Type: liquid category (i.e. Natural Gas Liquids, Natural gas condensate, Crude oil)
- Grade: oil quality (light, medium, heavy, sour) or API gravity
- 2P resvs: 2P (proven + probable) oil reserves in giga barrels (Gb).
- GOR: The ratio of produced gas to produced oil, commonly abbreviated GOR.
- Peak year: year of the production plateau/peak.
- Peak: maximum production expected (thousand barrels/day).
- Discovery: year of discovery.
- Capital investment: expected capital cost; FID (Final Investment Decision) - If no FID, then normally no project development contracts can be awarded. For many projects, a FEED stage (Front End Engineering Design) precedes the FID.
- Notes: comments about the project (footnotes).
- Ref: list of sources.
| Country | Project Name | Year startup | Operator | Area | Type | Grade | 2P resvs | GOR | Peak Year | Peak | Discovery | Capital Inv. | Notes | Ref |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| OPEC | ||||||||||||||
| Iran | Darkhovin Ph 3 | 2015 | Eni | LAND | Crude | 120 | ||||||||
| Iran | Kharg NGL | 2015 | NIOC | LAND | NGL | 85 | ||||||||
| Iran | South Pars Ph 19-24 | 2015 | NIOC | Condensate NGL | Light | 2016 | 240 | |||||||
| Iran | Yadavaran Ph 2 | 2015 | Sinopec | LAND | Crude | Heavy | 3.20 | 100 | 2000 | |||||
| UAE | Upper Zakum Exp | 2015 | ADNOC | Crude | Light | 2017 | 200 | 1963 | No FID | |||||
| Saudi Arabia | Manifa Ph 1 | 2015 | Saudi Aramco | OFF | Crude | 28 API | 16.820 | 300 | 1957 | |||||
| Saudi Arabia | Manifa NGL | 2015 | Saudi Aramco | OFF | NGL | 65 | 1957 | |||||||
| Venezuela | Orinoco Carabobo II | 2015 | PDVSA | Crude | 7-10 API | 5.7 | 2017 | 200 | no FID | |||||
| Non-OPEC | ||||||||||||||
| Angola | Block 14 Lianzi | 2015 | Chevron | ODW | Crude | 46 | ||||||||
| Azerbaijan | Inam / Yamalah | 2015 | Socar BP | Crude | 2.000 | 200 | ||||||||
| Brazil | Cachalote Ph 2 (Baleia Franca; Baleia Ana) | 2015 | Petrobras | ODW | 19-30 API | 100 | ||||||||
| Brazil | Tupi oil field | 2015 | Petrobras | Santos BM-S-11 | 28 | 5 | 2016 | 200 | 2007 | No FID | ||||
| Canada | Birch Mountain (Phase 2) | 2015 | CNRL | LAND | Bitumen | Oil sands | 30 | In-Situ, Announced | ||||||
| Canada | Borealis Ph 1 | 2015 | EnCana | LAND | Bitumen | Oil sands | 35 | In-Situ, Application | ||||||
| Canada | Horizon Mine & Upgrader (Phase 4) | 2015 | CNRL | LAND | Bitumen | Oil sands | 145 | Mining&Upgrading, Announced | ||||||
| Canada | Surmont Ph 2 | 2015 | ConocoPhillips | Oil sands | Bitumen | 130 | ||||||||
| East Timor | Greater Sunrise | 2015 | Woodside | NGL | 0.300 | 25 | No FID | |||||||
| Russia | Shtokman | 2015 | Gazprom | OFF | NGL | 0.200 | 2020 | 15 | ||||||
| South Africa | Mafutha CTL | 2015 | Sasol | CTL | 80 | No FID | ||||||||
| UK | Rosebank/Lochnagar | 2015 | Chevron | OFF | Crude | 0.450 | 2015 | 75 | 2004 | No FID | ||||
| UK | Western Isles | 2015 | Dana Petroleum | OFF | Crude | 40 | No FID | |||||||
| USA | Jack; St Malo | 2015 | Chevron | ODW | Crude | 1-15 | 200+ | No FID | ||||||
| USA | Kaskida | 2015 | BP | ODW | Crude | 0 | No FID 140 kbd | |||||||
Read more about this topic: Oil Megaprojects (2015)
Famous quotes containing the words detailed, list and/or projects:
“Modern tourist guides have helped raised tourist expectations. And they have provided the nativesfrom Kaiser Wilhelm down to the villagers of Chichacestenangowith a detailed and itemized list of what is expected of them and when. These are the up-to- date scripts for actors on the tourists stage.”
—Daniel J. Boorstin (b. 1914)
“Every morning I woke in dread, waiting for the day nurse to go on her rounds and announce from the list of names in her hand whether or not I was for shock treatment, the new and fashionable means of quieting people and of making them realize that orders are to be obeyed and floors are to be polished without anyone protesting and faces are to be made to be fixed into smiles and weeping is a crime.”
—Janet Frame (b. 1924)
“But look what we have built ... low-income projects that become worse centers of delinquency, vandalism and general social hopelessness than the slums they were supposed to replace.... Cultural centers that are unable to support a good bookstore. Civic centers that are avoided by everyone but bums.... Promenades that go from no place to nowhere and have no promenaders. Expressways that eviscerate great cities. This is not the rebuilding of cities. This is the sacking of cities.”
—Jane Jacobs (b. 1916)