Ohana Project - Several Steps of The Project

Several Steps of The Project

What is important to know about the project is that the big improvement is the use of optic fiber instead of mirrors to guide the beams in the interferometer recombination system.

So before doing some tests with the telescopes, the scientists had to prove that the elements used with the optics fiber were trustworthy (for example, the off-axis parabolla, used to inject the beams in the optics fiber). Those tests were partly carried out on the IOTA Observatory.

The next step, was to use two optics fiber of 300 m between Keck I and Keck II to look at the same source. This step was achieved on June 15, 2005. This step was a big relief for the project leader. It meant that the project was about to move on.

The current step of the project is the use of the CFHT and Gemini North together. To do that, a long delay line was integrated in the Meudon Observatory to be then used in the CFHT Coudé room. Currently, the delay line is to be shipped to Hawai'i to be integrated in the Coudé room.

The next step is the use of the two Keck and Subaru, then the use of Gemini North, the CFHT and UKIRT together, and finally, the use of all telescopes together.

Read more about this topic:  Ohana Project

Famous quotes containing the words steps and/or project:

    “All our steps are ordered by the LORD; how then can we understand our own ways?”
    —Bible: Hebrew, Proverbs 20:24.

    “Oh Death he is a little man,
    And he goes from do’ to do’ ...”
    —Federal Writers’ Project Of The Wor, U.S. public relief program (1935-1943)