Oakengates Tunnel
This tunnel was a major problem in the construction of the railway. It delayed the project by 3 years, between 1846 and 1849. Details of the difficulties are sketchy. It was originally built for broad gauge railways.
This tunnel is the longest on the Shrewsbury to Wolverhampton line and the longest of the three railway tunnels presently in use in Shropshire. It stretches for 471 yards.
The tunnel passed under the summit level of the Shropshire Canal and was the scene of a disaster in 1855, when a breach from the canal into the tunnel occurred. The entire summit level emptied into the tunnel, causing flooding in the town, although there were no reports of any personal injury.
Read more about this topic: Oakengates Railway Station
Famous quotes containing the word tunnel:
“It is the light
At the end of the tunnel as it might be seen
By him looking out somberly at the shower,
The picture of hope a dying man might turn away from,
Realizing that hope is something else, something concrete
You cant have.”
—John Ashbery (b. 1927)