Rebuild To DBR
In the late 1970s the decision was undertaken to rebuild the Db class along similar lines to that being undertaken for the Da class into the DC class. However, as the rebuild was not as extensive and did not involve conversion into another GMD model the rebuilt Db units were designated as DBR (R = rebuild). The work was undertaken by Clyde Engineering in Australia and involved the lowering of the short hood to improve visibility for the driver, new cabs and the installation of a new EMD 8-645 engine. Ten units were rebuilt between 1980 and 1982.
Read more about this topic: NZR DB Class
Famous quotes containing the word rebuild:
“We must not leap to the fatalistic conclusion that we are stuck with the conceptual scheme that we grew up in. We can change it, bit by bit, plank by plank, though meanwhile there is nothing to carry us along but the evolving conceptual scheme itself. The philosophers task was well compared by Neurath to that of a mariner who must rebuild his ship on the open sea.”
—Willard Van Orman Quine (b. 1908)