Planning
As a result of the expansion of the Nuremberg S-Bahn network in the period to 2010, work needs to be carried out on the existing S-Bahn platforms and new ones need to be built. The eastern end of the home platform (no. 1) of the future S-Bahn to Neumarkt (S3) is being lengthened; it will then have 213 m of usable length and a new height of 76 cm above the rail tops. An extra exit to the Osttunnel is also being constructed. For through services on the Hartmannshof – Nuremberg – Forchheim (S1) line, platforms 2 and 3 are being partially lowered to 76 cm and linked by a ramp to the unchanged 96 cm high existing structure. The platform intended for the S-Bahn to Ansbach (S4), number 11 (tracks 22 and 23) will be raised from its present height of 38 cm to 76 cm; at the same time stairs and a lift will be provided and a new platform roof.
Read more about this topic: Nuremberg Central Station
Famous quotes containing the word planning:
“In preparing for battle I have always found that plans are useless, but planning is indispensable.”
—Dwight D. Eisenhower (18901969)
“...A shadow now occasionally crossed my simple, sanguine, and life enjoying mind, a notion that I was never really going to accomplish those powerful literary works which would blow a noble trumpet to social generosity and noblesse oblige before the world. What? should I find myself always planning and never achieving ... a richly complicated and yet firmly unified novel?”
—Sarah N. Cleghorn (18761959)
“Sensuality takes planning and work.”
—Mason Cooley (b. 1927)