Qualification Criteria
This material is transcribed, with a few small edits, from Standard Operating Procedure #1802, US Army Engineer Reactors Group, Ft. Belvoir, VA, dated 1 July 1969. It is clear from these requirements that progression through the various licensing levels was not automatic, that is, there was much more required than simply working a given number of shifts. The first level of qualification was graduation from the Nuclear Power Plant Operator Course; the Basic badge is shown at right.
Read more about this topic: Nuclear Reactor Operator Badge
Famous quotes containing the word criteria:
“Every sign is subject to the criteria of ideological evaluation.... The domain of ideology coincides with the domain of signs. They equate with one another. Wherever a sign is present, ideology is present, too. Everything ideological possesses semiotic value.”
—V.N. (Valintin Nikolaevic)