Nova Scotia Highway 125 - History

History

The highway was built in the late 1950s - early 1960s and extended from North Sydney to Point Edward but branched off in Point Edward and continued along Nova Scotia Route 305 then Trunk 5 until Sydney River. When Highway 125 bypassed the Trunk 5 sections of 125 in the late 1960s - early 1970s it became a controlled access highway for alot of the highway. In 1970 the highway extended to Grand Lake Road bypassing Sydney to Nova Scotia Trunk 4. In the 1990s the highway became twinned from Balls Creek - Upper North Sydney and from the late 1990s- early 2000s it was twinned around North Sydney and waterlines were placed around Pottle Lake. In 2010 the highway was twinned from Point Edward to Sydney River. Currently the Province Of Nova Scotia is working on dividing the highway between Sydney River and Grand Lake Road

Read more about this topic:  Nova Scotia Highway 125

Famous quotes containing the word history:

    The history of all hitherto existing society is the history of class struggles.
    Karl Marx (1818–1883)

    Racism is an ism to which everyone in the world today is exposed; for or against, we must take sides. And the history of the future will differ according to the decision which we make.
    Ruth Benedict (1887–1948)

    The history of all Magazines shows plainly that those which have attained celebrity were indebted for it to articles similar in natureto Berenice—although, I grant you, far superior in style and execution. I say similar in nature. You ask me in what does this nature consist? In the ludicrous heightened into the grotesque: the fearful coloured into the horrible: the witty exaggerated into the burlesque: the singular wrought out into the strange and mystical.
    Edgar Allan Poe (1809–1849)