North South MRT Line - Line Disruptions

Line Disruptions

On 15 December 2011, services between Bishan and Marina Bay stations were suspended due to 40 metres of the power rail being damaged between City Hall and Dhoby Ghaut stations. Trains along the stretch were stalled, causing a disruption to the train service for almost 5 hours. Train service fully resume at 11.40pm.

On 17 December 2011, a similar fault caused a 7-hour disruption between Ang Mo Kio and Marina Bay stations. According to SMRT, the disruption was caused by damage to the third rail and the trains' collector shoes. Seven trains were damaged in this incident.

These two service disruptions on the North-South Line (NSL) caused major disruptions ever since SMRT started operation for 24 years.

Read more about this topic:  North South MRT Line

Famous quotes containing the word line:

    The real dividing line between early childhood and middle childhood is not between the fifth year and the sixth year—it is more nearly when children are about seven or eight, moving on toward nine. Building the barrier at six has no psychological basis. It has come about only from the historic-economic-political fact that the age of six is when we provide schools for all.
    James L. Hymes, Jr. (20th century)