Track Layout
The track around North Greenwich was designed to facilitate an extension of the line from this station. An extension probably towards Thamesmead was proposed; however this has not been developed beyond the initial proposal, and is not currently planned.
The track layout allows trains from Stanmore and Stratford to terminate at North Greenwich. A number of trains from Stanmore terminate here during peak and off peak times, and enter platform 2 instead of the usual platform 3. Trains head back towards Central London from platform 2.
During times of disruption and engineering work, trains from and back to Stratford can be routed into and out of platform 2.
Read more about this topic: North Greenwich Tube Station
Famous quotes containing the word track:
“Our achievements speak for themselves. What we have to keep track of are our failures, discouragements, and doubts. We tend to forget the past difficulties, the many false starts, and the painful groping. We see our past achievements as the end result of a clean forward thrust, and our present difficulties as signs of decline and decay.”
—Eric Hoffer (19021983)