Newport City Footbridge - Overview

Overview

The bridge features two A-Frame masts, which support the bridge from the west bank. The masts are positioned on a shared foundation and anchored at ground level by two 4+3⁄4-inch (120 mm) diameter cables that are connected the tips of the masts. The forward mast is 262 feet (80 m) long and the back mast is 226 feet (69 m) long. Because of the angle at which the masts are positioned, the bridge stands at 229 ft (70 m) above ground. The deck is 16 ft (4.9 m) wide and 13+1⁄2 ft (4.1 m) above water at high tide. The bridge has a clear span of 476 feet (145 m).

  • The bridge under construction

  • Usk footbridge opening

  • Usk footbridge masts

Read more about this topic:  Newport City Footbridge