Future
Currently there are several projects to improve SH 2. They include:
- Kopuku Realignment: under investigation to improve to four-lane highway between the Mangatawhiri and Maramarua Deviations. The project is primarily a realignment project aimed at improving road safety and providing passing opportunities.
- Maramarua Deviation: a bypass of Maramarua township, east of the SH 1/2 Pokeno turnoff, to improve road safety, provide passing opportunities and reduce holiday peak congestion in Maramarua township. Design proposals were completed in 2009 but no date had been set for the start of construction.
- Katikati Bypass: an investigation is currently being undertaken into the long-standing designation for the bypass to ensure that it will meet the future needs of Katikati, and is consistent with NZTA's overall strategy for long-term management of SH 2.
- Tauranga Eastern Motorway: a motorway almost 23 km long under construction from Te Maunga junction to Paengaroa, improving access from the east (Te Puke, Whakatane, Opotiki, Gisborne) and south from Rotorua and Taupo. It is the main route for trucks heading to the Port of Tauranga from Rotorua and the eastern Bay of Plenty, and connects the economically-important central plateau forestry industry with the port for export.
Read more about this topic: New Zealand State Highway 2
Famous quotes containing the word future:
“The future is ever a misted landscape, no man foreknows it, but at
cyclical turns
There is a change felt in the rhythm of events:”
—Robinson Jeffers (18871962)
“At sixty, I would like to give my future back its vistas of uncertainty.”
—Mason Cooley (b. 1927)
“Although Im trying very hard
To sound unlike a birthday card,
Thats all this is: so you may find it
Full of all that lies behind it
Admiration; friendship too;
And hope that in the future you
Reap ever richer revenue.”
—Philip Larkin (19221986)