Nanjing Metro - Signaling System

Signaling System

For Line 1, Siemens Transportation Systems (TS) was awarded the supply contract in November 2002.

For Line 2, Siemens Transportation Systems (TS) and its local partner Nanjing Research Institute of Electronic Technology (NRIET) have been awarded to supply the signaling system after signing a contract (about 25 million Euro). Technologies used include Trainguard MT, Vicos OC 501, Sicas ECC and Az S 350 U axle counting system.

Read more about this topic:  Nanjing Metro

Famous quotes containing the word system:

    Social and scientific progress are assured, sir, once our great system of postpossession payments is in operation, not the installment plan, no sir, but a system of small postpossession payments that clinch the investment. No possible rational human wish unfulfilled. A man with a salary of fifty dollars a week can start payments on a Rolls-Royce, the Waldorf-Astoria, or a troupe of trained seals if he so desires.
    John Dos Passos (1896–1970)