Future Upgrades
The Adare bypass is in the design phase and when finished, will carry the N21 around the village of Adare, Limerick. The road will be built as a dual carriageway and will link up with the northern section of the future M20 motorway from Patrickswell to Cork. It will spur off before Croom and link to the N21 south of Adare.
A 33 km (21 mi) Rathkeale/Abbeyfeale road scheme, with a bypass of Newcastle West and Abbeyfeale was at the planning stage in 2006. As of October 2008 it has not advanced beyond planning stage.
Read more about this topic: N21 Road (Ireland)
Famous quotes containing the word future:
“The future is ever a misted landscape, no man foreknows it, but at
cyclical turns
There is a change felt in the rhythm of events:”
—Robinson Jeffers (18871962)