List of Motorways
Motorways | |||||||||||
Name & Sign | Course | Length | Lanes | Completion Year | Status | Remarks | |||||
---|---|---|---|---|---|---|---|---|---|---|---|
Peshawar – Islamabad | 155 km | 6 | 2007 | Operational | |||||||
Islamabad – Lahore | 367 km | 6 | 1997 | Operational | |||||||
Pindi Bhattian (M-2) – Faisalabad | 54 km | 4 | 2003 | Operational | Connects M2 near Pindi Bhattian to Faisalabad | ||||||
Faisalabad – Multan | 233 km | 4 | 2014 | Under Construction | Under construction since 2009 | ||||||
Multan – Dera Ghazi Khan | 80 km | 4 | N/A | Planned | |||||||
Dera Ghazi Khan – Ratodero | 365 km | 4 | N/A | Planned | |||||||
Dadu – Hub | 270 km | 4 | N/A | Planned | |||||||
Ratodero – Gwadar | 892 km | 4 | 2016 | Partially Operational/Under Construction | 2-lane Ratodero-Khuzdar section complete and operationalized. 2 lanes nearing completion, 2 additional lanes to be added in future | ||||||
Hyderabad – Karachi | 136 km | 6 | 2014 | Under Construction | Upgradation of existing Super Highway into 6-lane motorway | ||||||
M-9 – N-25 (Karachi Northern Bypass) | 57 km | 4 | 2009 | Operational | Currently 2-lanes, to be upgraded to 4-lanes |
N/A = Not Available
Read more about this topic: Motorways Of Pakistan
Famous quotes containing the words list of and/or list:
“Loves boat has been shattered against the life of everyday. You and I are quits, and its useless to draw up a list of mutual hurts, sorrows, and pains.”
—Vladimir Mayakovsky (18931930)
“We saw the machinery where murderers are now executed. Seven have been executed. The plan is better than the old one. It is quietly done. Only a few, at the most about thirty or forty, can witness [an execution]. It excites nobody outside of the list permitted to attend. I think the time for capital punishment has passed. I would abolish it. But while it lasts this is the best mode.”
—Rutherford Birchard Hayes (18221893)