Mont Blanc Tunnel - Construction Statistics

Construction Statistics

  • Workforce: 5 engineers and 350 workmen worked an estimated grand total of 4,600,000 man-hours to complete the project.
  • Explosives: 711 tonnes (700 long tons; 784 short tons) of explosives were used to blast 555,000 cubic metres (19,600,000 cu ft) of rock.
  • Energy: 37 million kiloWatt-hour and 2.7 million litres of fuel for trucks and engines.
  • Other facts: 771,240 bolts, 6,900 drill rods, and 300 tonnes (300 long tons; 330 short tons) of iron were used to support the vault, 5,000 cubic metres (180,000 cu ft) of formwork for 60,000 tonnes (59,000 long tons; 66,000 short tons) of cement (mixed with 280,000 m3/9,900,000 cu ft of aggregates).

Read more about this topic:  Mont Blanc Tunnel

Famous quotes containing the words construction and/or statistics:

    Striving toward a goal puts a more pleasing construction on our advance toward death.
    Mason Cooley (b. 1927)

    Maybe a nation that consumes as much booze and dope as we do and has our kind of divorce statistics should pipe down about “character issues.” Either that or just go ahead and determine the presidency with three-legged races and pie-eating contests. It would make better TV.
    —P.J. (Patrick Jake)