Mont Blanc Tunnel - Construction Statistics

Construction Statistics

  • Workforce: 5 engineers and 350 workmen worked an estimated grand total of 4,600,000 man-hours to complete the project.
  • Explosives: 711 tonnes (700 long tons; 784 short tons) of explosives were used to blast 555,000 cubic metres (19,600,000 cu ft) of rock.
  • Energy: 37 million kiloWatt-hour and 2.7 million litres of fuel for trucks and engines.
  • Other facts: 771,240 bolts, 6,900 drill rods, and 300 tonnes (300 long tons; 330 short tons) of iron were used to support the vault, 5,000 cubic metres (180,000 cu ft) of formwork for 60,000 tonnes (59,000 long tons; 66,000 short tons) of cement (mixed with 280,000 m3/9,900,000 cu ft of aggregates).

Read more about this topic:  Mont Blanc Tunnel

Famous quotes containing the words construction and/or statistics:

    When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.
    Edmund Burke (1729–1797)

    He uses statistics as a drunken man uses lamp-posts—for support rather than illumination.
    Andrew Lang (1844–1912)