Miami Dolphins Training Facility - The Bubble

The Bubble

September 26, 2006 the Dolphins made their first significant expansion to the facility since it first opened with the opening of an air supported air conditioned indoor training field. The structure is 96,600 square feet (8,970 m2) and is 72 feet (22 m) tall in the center.

“We’re proud to become the first professional football team in Florida to have such a venue. We believe it will help the team from a competitive standpoint as it will allow for closer game simulation during practice and allow the team to continue practicing even when storms roll in,” Bryan Wiedmeier, president of the Miami Dolphins, said.

The fabric used is extremely light, yet strong. Inflation is maintained via fans in the HVAC units through the integrated control system.

The structure was designed to withstand hurricane force winds up to category three. Internal air pressure is increased to "stiffen" the structure to withstand wind loading.

Read more about this topic:  Miami Dolphins Training Facility

Famous quotes containing the word bubble:

    If the bubble reputation can be obtained only at the cannon’s mouth, I am willing to go there for it, provided the cannon is empty.
    Mark Twain [Samuel Langhorne Clemens] (1835–1910)

    No bubble is so iridescent or floats longer than that blown by the successful teacher.
    Sir William Osler (1849–1919)