Material Requirements Planning - History

History

Prior to MRP, and before computers dominated industry, reorder-point/reorder-quantity (ROP/ROQ) type methods like EOQ (Economic Order Quantity) had been used in manufacturing and inventory management. In 1964, Joseph Orlicky as a response to the TOYOTA Manufacturing Program, developed Material Requirements Planning (MRP). First company to use MRP was Black & Decker in 1964, with Dick Alban as project leader. In 1983 Oliver Wight developed MRP into manufacturing resource planning (MRP II). Orlicky's book is entitled The New Way of Life in Production and Inventory Management (1975). By 1975, MRP was implemented in 150 companies. This number had grown to about 8,000 by 1981. In the 1980s, Joe Orlicky's MRP evolved into Oliver Wight's manufacturing resource planning (MRP II) which brings master scheduling, rough-cut capacity planning, capacity requirements planning, S&OP in 1983 and other concepts to classical MRP. By 1989, about one third of the software industry was MRP II software sold to American industry ($1.2 billion worth of software).

Read more about this topic:  Material Requirements Planning

Famous quotes containing the word history:

    Revolutions are the periods of history when individuals count most.
    Norman Mailer (b. 1923)

    The second day of July 1776, will be the most memorable epoch in the history of America. I am apt to believe that it will be celebrated by succeeding generations as the great anniversary festival. It ought to be commemorated, as the day of deliverance, by solemn acts of devotion to God Almighty. It ought to be solemnized with pomp and parade, with shows, games, sports, guns, bells, bonfires and illuminations, from one end of this continent to the other, from this time forward forever more
    John Adams (1735–1826)

    History is the present. That’s why every generation writes it anew. But what most people think of as history is its end product, myth.
    —E.L. (Edgar Lawrence)