Material Requirements Planning - History

History

Prior to MRP, and before computers dominated industry, reorder-point/reorder-quantity (ROP/ROQ) type methods like EOQ (Economic Order Quantity) had been used in manufacturing and inventory management. In 1964, Joseph Orlicky as a response to the TOYOTA Manufacturing Program, developed Material Requirements Planning (MRP). First company to use MRP was Black & Decker in 1964, with Dick Alban as project leader. In 1983 Oliver Wight developed MRP into manufacturing resource planning (MRP II). Orlicky's book is entitled The New Way of Life in Production and Inventory Management (1975). By 1975, MRP was implemented in 150 companies. This number had grown to about 8,000 by 1981. In the 1980s, Joe Orlicky's MRP evolved into Oliver Wight's manufacturing resource planning (MRP II) which brings master scheduling, rough-cut capacity planning, capacity requirements planning, S&OP in 1983 and other concepts to classical MRP. By 1989, about one third of the software industry was MRP II software sold to American industry ($1.2 billion worth of software).

Read more about this topic:  Material Requirements Planning

Famous quotes containing the word history:

    A country grows in history not only because of the heroism of its troops on the field of battle, it grows also when it turns to justice and to right for the conservation of its interests.
    Aristide Briand (1862–1932)

    The History of the world is not the theatre of happiness. Periods of happiness are blank pages in it, for they are periods of harmony—periods when the antithesis is in abeyance.
    Georg Wilhelm Friedrich Hegel (1770–1831)

    America is the only nation in history which, miraculously, has gone directly from barbarism to degeneration without the usual interval of civilization.
    Attributed to Georges Clemenceau (1841–1929)