Massachusetts Route 128 - Route 128 Corridor Study

Route 128 Corridor Study

The Boston area MPO studied the Route 128/I-95 Corridor from approximately 2005–2010. The study focused on the heavily congested section from I-90 (Newton) to US 3 (Burlington), and was completed in November 2010. As of 2010, the highway carried over 200,000 vehicles per day. Some possible improvements to Route 128 include HOV or HOT Lanes, reconstruction of shoulders, ramp metering, bus on shoulder, and fiber optic traffic system improvements. More studies will need to be completed before projects will begin.

Read more about this topic:  Massachusetts Route 128

Famous quotes containing the words route, corridor and/or study:

    The route through childhood is shaped by many forces, and it differs for each of us. Our biological inheritance, the temperament with which we are born, the care we receive, our family relationships, the place where we grow up, the schools we attend, the culture in which we participate, and the historical period in which we live—all these affect the paths we take through childhood and condition the remainder of our lives.
    Robert H. Wozniak (20th century)

    And now in one hour’s time I’ll be out there again. I’ll raise my eyes and look down that corridor four feet wide with ten lonely seconds to justify my whole existence.
    Colin Welland (b. 1934)

    The only trouble here is they won’t let us study enough. They are so afraid we shall break down and you know the reputation of the College is at stake, for the question is, can girls get a college degree without ruining their health?
    Ellen Henrietta Swallow Richards (1842–1911)