Future
An interchange is planned between MD 12 and US 113 south of Snow Hill in order to improve safety and traffic flow as a follow up to widening US 113; however, the project is currently on hold. This proposed interchange is to be a dumbbell interchange, a variation of the diamond interchange with two roundabouts on MD 12 where it intersects the ramps to US 113. The proposed cost needed to build this interchange is $24.2 million, which includes engineering, acquisition of land, and the actual construction.
Read more about this topic: Maryland Route 12
Famous quotes containing the word future:
“I am always glad to think that my education was, for the most part, informal, and had not the slightest reference to a future business career. It left me free and untrammeled to approach my business problems without the limiting influence of specific training.”
—Alice Foote MacDougall (18671945)
“[With the Union saved] its form of government is saved to the world; its beloved history, and cherished memories, are vindicated; and its happy future fully assured, and rendered inconceivably grand.”
—Abraham Lincoln (18091865)
“He had been given to behold
The races future trial place,
A fresh start for the human race.”
—Robert Frost (18741963)