Malaysian Expressway System - Controversial Issues

Controversial Issues

There are several controversial issues regarding the construction of expressways. The main issue is the increase of toll rates, which can be a huge burden especially for residents of Kuala Lumpur and the surrounding Klang Valley conurbation.

There are also various parties who question the capability of the numerous expressways in Klang Valley to overcome traffic congestion, which does not show signs of improvement with the construction of new expressways.

Other controversial issues include the following:

  1. The cracks found on beams on the Kepong Flyover in Kuala Lumpur Middle Ring Road 2 (MRR2) on 10 August 2004.
  2. The flyover which collapsed on Setia Alam Interchange in New Klang Valley Expressway during construction on 10 July 2005, where, tragically, about 4 lives were lost.
  3. The 8 fallen I-beams at the Pajam Interchange in Negri Sembilan during the construction of the Kajang-Seremban Highway (LEKAS Highway) on the night of 27 September 2007.

Read more about this topic:  Malaysian Expressway System

Famous quotes containing the word issues:

    The “universal moments” of child rearing are in fact nothing less than a confrontation with the most basic problems of living in society: a facing through one’s children of all the conflicts inherent in human relationships, a clarification of issues that were unresolved in one’s own growing up. The experience of child rearing not only can strengthen one as an individual but also presents the opportunity to shape human relationships of the future.
    Elaine Heffner (20th century)