Luzhou Line (Taipei Metro) - History

History

Although the line was called the Luzhou Branch Line during construction, the name was changed to simply the Luzhou Line before it opened for service.

  • 2002: The Luzhou and Xinzhuang lines begin construction as part of Phase II development of the Taipei Metro.
  • September 2007: Track laying begins for the Luzhou Line.
  • September 25, 2008: Since track laying has been completed for the Luzhou Line, tracks are laid for the segment of the Xinzhuang Line within Taipei.
  • April 1, 2009: Train testing begins for the Luzhou Line and the segment of the Xinzhuang Line within Taipei.
  • August 22, 2009: It is announced that although the line was to come into operation before the Spring Festival of 2010, due to malfunctions in the Neihu Line, service for the line would be pushed back to September 2010.
  • April 24, 2009: The Department of Rapid Transit Systems (DORTS) denies saying that the line would open before the Spring Festival in 2010. The Executive Yuan sets the line to begin service by December 31, 2010. DORTS says it will push forward with an anticipated September 2010 opening date.
  • March 2, 2010: DORTS says that the line is planned to open by September 1, 2010 in order to coincide with the Flora Expo. It will use the Taoyuan International Airport MRT's power as backup, so that by November 2010 the Xinzhuang Line can begin train testing through Touqianzhuang.
  • May 2010: Construction for Sanchong Elementary School, Sanhe Junior High School, Luzhou, and Luzhou Depot is completed. Construction for Sanmin Senior High School and St. Ignatius High School is finishing up.
  • June 30, 2010: Construction finishes on all stations.
  • July 2010: Train testing begins.
  • September 4–5, 2010: The Luzhou Line and Xinzhuang Line city portion (to Zhongxiao Xinsheng) undergoes initial public testing.
  • November 3, 2010: The line opens for service with the opening of the Luzhou to Zhongxiao Xinsheng section. A free trial period for the line will run until December 2, 2010.
  • December 3, 2010: The line began revenue service.

Read more about this topic:  Luzhou Line (Taipei Metro)

Famous quotes containing the word history:

    In the history of the United States, there is no continuity at all. You can cut through it anywhere and nothing on this side of the cut has anything to do with anything on the other side.
    Henry Brooks Adams (1838–1918)

    The history of men’s opposition to women’s emancipation is more interesting perhaps than the story of that emancipation itself.
    Virginia Woolf (1882–1941)

    The history of work has been, in part, the history of the worker’s body. Production depended on what the body could accomplish with strength and skill. Techniques that improve output have been driven by a general desire to decrease the pain of labor as well as by employers’ intentions to escape dependency upon that knowledge which only the sentient laboring body could provide.
    Shoshana Zuboff (b. 1951)