Louisiana Department of Transportation and Development - DOTD Projects

DOTD Projects

The following is a partial list of objectives of the DOTD and is a five year plan that began July 1, 2008 and ends June 30, 2013.

  • Objective 2.1.1: Ports and Harbors; Invest in port and harbor infrastructure to maintain a top position in maritime commerce.
  • Objective 2.1.2: Flood Control; Invest in flood control projects to reduce flood damage
  • Objective 2.1.3: Flood Insurance Reduction; The DOTD has a goal working with FEMA to ensure flood insurance policyholders receive annual rate reductions by June 3, 2013
  • Objective 2.1.4: Water Resources; Infrastructure conditions and serviceability assessments on flood protection systems, dam safety, and water wells.
  • Objective 2.1.5: Marine transportation; Develop a statewide "Marine Transportation System" (MTS) program to mitigate highway congestion.
  • Objective 2.1.6: Rail Transportation; Implement a statewide Rail Transportation System (RTS) program to mitigate highway congestion.
  • Objective 2.2: Aviation responsibilities; Airport aviation safety, regulations, and capital improvements.
  • Objective 2.3.1: Public Transportation; Improve and expand rural public transportation to 50 parishes.
  • Objective 3.1.1: Engineering and Operations; Effectively maintain and improve the state highway system.
  • Objective 3.1.2: TIMED Program; Ensure that all program goals are completed by December, 2013.
  • Objective 3.1.3: Bridges; Improve the condition and safety of Louisiana deficient bridges to not more than 23% by June 30, 2013. NOTE: The web site list the year as 3013 but this is an obvious misprint for a five year goal.
  • Objective 3.1.4: Rest Areas; Improve Louisiana's image with the "Rest Area Improvement Plan".
  • Objective 3.2: Bridge Trust; Maintain bridges and ferries across the Mississippi in the parishes of Jefferson, Orleans, and St. Bernard.
  • Objective 3.3; Planning and Programming; Provide strategic direction for a seamless, multimodal transportation system. A main goal is to reduce the number of fatalities on Louisiana highways by 6% per year.
  • Objective 3.4.1: Traffic Safety; Reduce the length of time from study, design, to installation of new or modified traffic signals.
  • Objective 3.4.2: Emergency Management; Implement a comprehensive emergency management program.
  • Objective 3.4.3; Advanced Traffic Management System (ATMS); This program has several goals to include traffic management in metropolitan areas; establish regional, district, and statewide traffic management centers; motorist assistance; traveler information; update and enhance the Louisiana "Commercial Vehicle Information System and Network" (CVISN)
  • Objective 3.4.4 : Statewide highway marking program; To develop and implement an interstate roadway marking program for at least 90% of all interstate roadways.
  • Objective 3.5.1: Marine operations(ferries); To operate, maintain, and police, ferries crossing the Mississippi.

Read more about this topic:  Louisiana Department Of Transportation And Development

Famous quotes containing the word projects:

    One of the things that is most striking about the young generation is that they never talk about their own futures, there are no futures for this generation, not any of them and so naturally they never think of them. It is very striking, they do not live in the present they just live, as well as they can, and they do not plan. It is extraordinary that whole populations have no projects for a future, none at all.
    Gertrude Stein (1874–1946)