LNER Class A4 4496 Dwight D Eisenhower - Technical Details

Technical Details

Like all the early A4 locomotives prior to Mallard, Golden Shuttle was released to service with a single chimney and side valances covering the wheels. The valances were removed to aid in maintenance during a general overhaul on 30 January 1942. Experimental Automatic Train Control equipment was fitted on 23 June 1950. A double chimney and Kylchap double blastpipe was installed to help performance, during an overhaul 20 August 1958. A Smith-Stone type speed indicator was installed 30 June 1960.

Dwight D. Eisenhower has had eleven boilers during her career: 8959 (from new); 8945 (from 4482 Golden Eagle), 30 January 1942; 8906 (spare) from 23 November 1946; 8955 (from 60026 Miles Beevor), 14 June 1950; 29314 (new), 9 November 1951; 29303 (from 60030 Guillemot) 18 June 1954; 29296 (from 60033 Seagull), 8 July 1955; 29308 (from 60032 Golden Fleece), 20 December 1956; 29312 (from 60010 Dominion of Canada), 20 August 1958; 27964 (new), 30 June 1960 and finally 29335 (from 60019 Bittern), 17 May 1962.

Dwight D. Eisenhower had two tenders during her career: 5651 from new and 5671 from 1 April 1957.

Read more about this topic:  LNER Class A4 4496 Dwight D Eisenhower

Famous quotes containing the words technical and/or details:

    A technical objection is the first refuge of a scoundrel.
    Heywood Broun (1888–1939)

    Then he told the news media
    the strange details of his death
    and they hammered him up in the marketplace
    and sold him and sold him and sold him.
    My death the same.
    Anne Sexton (1928–1974)