2009
|
|
|
|
|
||
120. | Expedition 18 * |
Yuri Lonchakov Michael Fincke |
March 10, 2009 16:22 |
March 10, 2009 21:11 |
4 hours, 49 minutes | |
Installed the EXPOSE-R onto the universal science platform of the Zvezda module, removed tape straps from the area of the docking target on the Pirs airlock and docking compartment, inspected and photographed the exterior of the Russian portion of the station. | ||||||
121. | STS-119 |
Steven R. Swanson Richard R. Arnold |
March 19, 2009 17:16 |
March 19, 2009 23:23 |
6 hours, 7 minutes | |
Installed the Starboard 6 (S6) truss to the S5 truss, connected S5/S6 umbilicals, released launch restraints, removed keel pins, stored and removed thermal covers, and deployed the S6 photovoltaic radiator. | ||||||
122. | STS-119 |
Steven R. Swanson Joseph M. Acaba |
March 21, 2009 16:51 |
March 21, 2009 23:21 |
6 hours, 30 minutes | |
Advanced preparation of a worksite for STS-127, partially installed an unpressurized cargo carrier attachment system on the P3 truss, installed a Global Positioning System antenna to the Kibo laboratory, and obtained infrared imagery of panels of the radiators on the P1 and S1 trusses. | ||||||
123. | STS-119 |
Joseph M. Acaba Richard R. Arnold |
March 23, 2009 15:37 |
March 23, 2009 22:04 |
6 hours, 27 minutes | |
Relocated a crew equipment cart, completed the deployment of a cargo carrier, and finished swapping electrical relays to the station’s gyroscopes. | ||||||
124. | Expedition 20 * |
Gennady Padalka Michael R. Barratt |
June 5, 2009 7:52 |
June 5, 2009 12:46 |
4 hours, 54 minutes | |
Prepared the Zvezda service module transfer compartment for the arrival of the Mini-Research Module 2, installed docking antenna for the module, photographed antenna for evaluation on the ground, and photographed the Strela-2 crane. | ||||||
125. | Expedition 20 |
Gennady Padalka Michael R. Barratt |
June 10, 2009 6:55 |
June 10, 2009 7:07 |
12 minutes | |
Internal spacewalk in the depressurized Zvezda transfer compartment, replaced one of the Zvezda hatches with a docking cone, in preparation for the docking of the Mini-Research Module 2, or MRM2, later this year. The MRM2 will dock automatically to the zenith port of Zvezda, and serve as an additional docking port for Russian vehicles. | ||||||
126. | STS-127 |
David Wolf Timothy L. Kopra |
July 18, 2009 16:19 |
July 18, 2009 21:51 |
5 hours, 32 minutes | |
JEF installed and P3 nadir UCCAS deployed. S3 zenith outboard PAS deploy postponed due to time constraints. | ||||||
127. | STS-127 |
David Wolf Thomas Marshburn |
July 20, 2009 15:27 |
July 20, 2009 22:20 |
6 hours, 53 minutes | |
Transferred Orbital Replacement Units (ORUs) from the Shuttle Integrated Cargo Carrier (ICC) to the External Stowage Platform-3 (ESP-3). Transferred materials included a spare high-gain antenna, cooling-system pump module and spare parts for the Mobile Servicing System. JEF Visual Equipment (JEF-VE) installation on the forward section was postponed due to time constraints. | ||||||
128. | STS-127 |
David Wolf Christopher Cassidy |
July 22, 2009 14:32 |
July 22, 2009 20:31 |
5 hours, 59 minutes | |
JPM preparation work, ICS-EF MLI, and P6 battery replacement (2 of 6 units). EVA was cut short due to high levels of CO2in Cassidy's suit. | ||||||
129. | STS-127 |
Christopher Cassidy Thomas Marshburn |
July 24, 2009 13:54 |
July 24, 2009 21:06 |
7 hours, 12 minutes | |
P6 battery replacement (final 4 of 6). | ||||||
130. | STS-127 |
Christopher Cassidy Thomas Marshburn |
July 27, 2009 11:33 |
July 27, 2009 16:27 |
4 hours, 54 minutes | |
SPDM thermal cover adjustment, Z1 patch panel reconfiguration, JEM visual equipment (JEM-VE) installation (forward and aft), and JEM-LTA reconfigurations. S3 Nadir PAS (outboard) deployment postponed to later mission. | ||||||
131. | STS-128 |
John D. Olivas Nicole P. Stott |
September 1, 2009 21:49 |
September 2, 2009 04:24 |
6 hours, 35 minutes | |
Prepared for the replacement of an empty ammonia tank on the station’s port truss by releasing its bolts. Retrieved the MISSE-6 and EuTEF experiments mounted outside of Columbus, and stowed them in the Shuttle's payload bay for their return to Earth. (Stott became the 9th American woman to perform an EVA, and the 10th woman spacewalker.) | ||||||
132. | STS-128 |
John D. Olivas Christer Fuglesang |
September 3, 2009 22:13 |
September 4, 2009 04:51 |
6 hours, 39 minutes | |
Removed the new ammonia tank from the shuttle's payload bay and replaced it with the used tank from the station. The new tank, weighing about 1,800 pounds (820 kg), was the most mass ever moved by spacewalking astronauts. | ||||||
133. | STS-128 |
John D. Olivas Christer Fuglesang |
September 5, 2009 20:39 |
September 6, 2009 03:40 |
7 hours, 1 minute | |
Prepared for the arrival of Tranquility by attaching cables between the starboard truss and Unity, the area where Tranquility will be installed. The spacewalkers also replaced a communications sensor device, installed two new GPS antennas, deployed the PAS on the S3 truss, and replaced a circuit breaker. | ||||||
134. | STS-129 |
Michael Foreman Robert Satcher |
November 19, 2009 14:24 |
November 19, 2009 21:01 |
6 hours, 37 minutes | |
Installed a spare antenna on the station’s truss and a bracket for ammonia lines on Unity. Lubricated the grapple mechanism on the Payload Orbital Replacement Unit Attachment Device on the Mobile Base System and lubricated the snares of the hand of the station's Japanese robotic arm. Deployed the S3 outboard Payload Attach System. | ||||||
135. | STS-129 |
Michael Foreman Randolph Bresnik |
November 21, 2009 14:31 |
November 21, 2009 20:39 |
6 hours, 8 minutes | |
Installed the GATOR (Grappling Adaptor to On-Orbit Railing) bracket to Columbus and an additional ham radio antenna. Installed on the truss an antenna for wireless helmet camera video. Relocated the Floating Potential Measurement Unit that records electrical potential around the station as it orbits the Earth. Deployed two brackets to attach cargo on the truss. | ||||||
136. | STS-129 |
Robert Satcher Randolph Bresnik |
November 23, 2009 13:24 |
November 23, 2009 19:06 |
5 hours, 42 minutes | |
Installed a new High Pressure Gas Tank (HPGT) on the Quest airlock. Installed MISSE-7A and 7B on ELC-2. Strapped two micrometeoroid and orbital debris (MMOD) shields to External Stowage Platform #2. Relocated foot restraint, released a bolt on Ammonia Tank Assembly, installed insulated covers on cameras on mobile servicing system and Canadarm 2's end effector. Worked heater cables on docking adapter. |
Read more about this topic: List Of International Space Station Spacewalks