2008
|
|
|
|
|
||
101. | Expedition 16 |
Peggy Whitson Daniel M. Tani |
January 30, 2008 09:56 |
January 30, 2008 17:06 |
7 hours, 10 minutes | |
Replaced the Bearing Motor Roll Ring Module on one of the station's solar wings, and inspected and photographed the starboard Solar Alpha Rotary Joint (SARJ). | ||||||
102. | STS-122 |
Rex J. Walheim Stanley G. Love |
February 11, 2008 14:13 |
February 11, 2008 22:11 |
7 hours, 58 minutes | |
Installed a grapple fixture on Columbus while it was still in the shuttle’s payload bay, prepared electrical and data connections on Columbus, and replaced a large nitrogen tank used for pressurizing the station's ammonia cooling system. | ||||||
103. | STS-122 |
Rex J. Walheim Hans Schlegel |
February 13, 2008 14:27 |
February 13, 2008 21:12 |
6 hours, 45 minutes | |
Installed the P1 Truss Nitrogen (N2) tank assembly, stowed the old N2 tank assembly into the shuttle's payload bay, and completed routing for the Station-to-Shuttle Power Transfer System (SSPTS). | ||||||
104. | STS-122 |
Rex J. Walheim Stanley G. Love |
February 15, 2008 14:27 |
February 15, 2008 20:32 |
7 hours, 25 minutes | |
Installed the Solar Monitoring Observatory (SOLAR) telescope and the European Technology Exposure Facility (EuTEF) facility onto an External Stowage Platform (ESP) on Columbus. Retrieved a failed Control Moment Gyroscope (CMG), installed the failed CMG into the shuttle's payload bay, and installed keel pin cloth covers on Columbus. | ||||||
105. | STS-123 |
Richard M. Linnehan Garrett Reisman |
March 14, 2008 01:18 |
March 14, 2008 08:19 |
7 hours, 01 minute | |
Installed the Japanese Experiment Logistics Module, Pressurized Section (ELM-PS) onto its temporary location on top of Harmony, and began assembly of the Special Purpose Dexterous Manipulator (Dextre) . | ||||||
106. | STS-123 |
Richard M. Linnehan Michael Foreman |
March 15, 2008 23:49 |
March 16, 2008 06:57 |
7 hours, 08 minutes | |
Dextre assembly continued, two "arms" attached to Dextre. | ||||||
107. | STS-123 |
Richard M. Linnehan Robert L. Behnken |
March 17, 2008 22:51 |
March 18, 2008 05:44 |
6 hours, 53 minutes | |
Dextre assembly completed. Spare equipment for the station installed onto an external stowage platform (ESP) on the Quest airlock, including a yaw joint for the station’s robotic arm, Canadarm2, and two spare direct current switching units. | ||||||
108. | STS-123 |
Michael Foreman Robert L. Behnken |
March 20, 2008 22:04 |
March 21, 2008 04:28 |
6 hours, 24 minutes | |
Replaced a Remote Power Control (RPC) module, and tested shuttle thermal tile repair materials and techniques. Removed a cover from the left arm of Dextre, and removed launch locks from the Harmony module. Released launch locks on Harmony’s port and nadir Common Berthing Mechanisms (CBM). | ||||||
109. | STS-123 |
Michael Foreman Robert L. Behnken |
March 22, 2008 20:34 |
March 23, 2008 02:36 |
6 hours, 02 minutes | |
Stored the shuttle Orbiter Boom Sensor System (OBSS) onto the station, installed a materials experiment on the outside of the Columbus laboratory, and inspected the Solar Alpha Rotary Joint (SARJ). | ||||||
110. | STS-124 |
Michael E. Fossum Ronald J. Garan |
June 3, 2008 16:24 |
June 3, 2008 23:12 |
6 hours, 48 minutes | |
Released straps on the shuttle's robotic arm elbow joint camera, transferred the OBSS back to the shuttle. Prepared the Japanese Experiment Module, Pressurized Module (JEM-PM), named Kibo, for installation. Replaced a trundle bearing assembly on the starboard Solar Alpha Rotary Joint, and inspected damage on the SARJ. | ||||||
111. | STS-124 |
Michael E. Fossum Ronald J. Garan |
June 5, 2008 15:04 |
June 5, 2008 22:15 |
7 hours, 11 minutes | |
Installed covers and external equipment to Kibo, prepared for the relocation of the Japanese Experiment Logistics Module, Pressurized Section (ELM-PS). Prepared a nitrogen tank assembly for removal, and the new tank was stowed on an External Stowage Platform to prepare for installation. Removed a television camera with failed power supply. | ||||||
112. | STS-124 |
Michael E. Fossum Ronald J. Garan |
June 8, 2008 13:55 |
June 8, 2008 20:28 |
6 hours, 33 minutes | |
Removed and replaced the starboard nitrogen tank assembly. Finished outfitting the Kibo laboratory. Reinstalled a television camera with a repaired power supply. | ||||||
113. | Expedition 17 * |
Sergei Volkov Oleg Kononenko |
July 10, 2008 18:48 |
July 11, 2008 1:06 |
6 hours 18 minutes | |
Inspected the Soyuz TMA-12 spacecraft, removed a pyrotechnic bolt from the Soyuz, installed a docking target for the new Russian MRM (Multipurpose Research Module) on the Service Module Transfer Compartment. | ||||||
114. | Expedition 17 * |
Sergei Volkov Oleg Kononenko |
July 15, 2008 17:08 |
July 15, 2008 23:02 |
5 hours 54 minutes | |
Installed a docking target on the Zvezda service module. Installed the Vsplesk experiment, straightened the ham radio antenna, and retrieved the Biorisk experiment. | ||||||
115. | STS-126 |
Heidemarie Stefanyshyn-Piper Stephen G. Bowen |
November 18, 2008 18:09 |
November 19, 2008 01:01 |
6 hours, 52 minutes | |
Transferred an empty nitrogen tank assembly from ESP3 to the shuttle’s cargo bay, transferred a new flex hose rotary coupler to ESP3 for future use, removed an insulation cover on the Kibo External Facility berthing mechanism, began cleaning and lubrication of the starboard SARJ, and replacement of its 11 trundle bearing assemblies. | ||||||
116. | STS-126 |
Heidemarie Stefanyshyn-Piper Robert S. Kimbrough |
November 20, 2008 17:58 |
November 21, 2008 00:43 |
6 hours, 45 minutes | |
Relocated the two Crew and Equipment Translation Aid (CETA) carts from the starboard side of the Mobile Transporter to the port side, lubricated the station robotic arm’s latching end effector A snare bearings, continued cleaning and lubrication of the starboard SARJ. EVA was conducted on the station's tenth year anniversary. | ||||||
117. | STS-126 |
Heidemarie Stefanyshyn-Piper Stephen G. Bowen |
November 22, 2008 18:01 |
November 23, 2008 00:58 |
6 hours, 57 minutes | |
Completed cleaning and lubrication of all but one of the trundle bearing assemblies (TBA) on the starboard SARJ. The final TBA will be replaced during EVA 4. | ||||||
118. | STS-126 |
Stephen G. Bowen Robert S. Kimbrough |
November 24, 2008 18:24 |
November 25, 2008 00:31 |
6 hours, 7 minutes | |
Completed replacement of trundle bearing assemblies on starboard SARJ, lubricated the port SARJ, installed a video camera, re‐installed insulation covers on the Kibo External Facility berthing mechanism, performed Kibo robotic arm grounding tab maintenance, installed spacewalk handrails on Kibo, installed Global Positioning Satellite (GPS) antennae on Kibo, photographed radiators, and photographed trailing umbilical system cables. | ||||||
119. | Expedition 18 * |
Yuri Lonchakov Michael Fincke |
December 23, 2008 00:51 |
December 23, 2008 06:29 |
5 hours, 38 minutes | |
Installed the electromagnetic energy measuring device, (Langmuir probe) on Pirs, removed the Russian Biorisk long-duration experiment, installed the Expose-R experiment package on Zvezda, but subsequently removed it after it failed to activate and transmit telemetry on ground command. Installed the Impulse experiment, and photographed external ISS structures as part of the “Panorama-2008” detailed test objective (DTO). |
Read more about this topic: List Of International Space Station Spacewalks