2000
|
|
|
|
|
|
5. | STS-101 † |
James S. Voss Jeffrey N. Williams |
May 22, 2000 01:48 |
May 22, 2000 08:32 |
6 hours, 44 minutes |
Inspected and secured U.S.-built cargo crane known as the Orbital Replacement Unit Transfer Device, completed assembly of a Russian cargo crane called Strela, and replaced one of Unity's two early communication antennas. | |||||
6. | STS-106 † |
Edward T. Lu Yuri Ivanovich Malenchenko |
September 11, 2000 04:47 |
September 11, 2000 11:01 |
6 hours, 14 minutes |
Attached cabling that integrated the Zvezda module fully to the rest of the ISS, and constructed and attached a magnetometer that serves as a backup navigation system for the station. | |||||
7. | STS-92 † |
Leroy Chiao William S. McArthur |
October 15, 2000 14:27 |
October 15, 2000 20:55 |
6 hours, 28 minutes |
Connected two sets of cables to provide power to heaters and conduits located on the Z1 truss, relocated two communication antenna assemblies, and installed a toolbox for use during future on-orbit construction. | |||||
8. | STS-92 † |
Michael E. Lopez-Alegria Peter J.K. Wisoff |
October 16, 2000 14:15 |
October 16, 2000 21:22 |
7 hours, 07 minutes |
Installed the Pressurized Mating Adapter (PMA)-3 docking port, and prepared the Z1 truss for the installation of the solar arrays. | |||||
9. | STS-92 † |
Leroy Chiao William S. McArthur |
October 17, 2000 14:30 |
October 17, 2000 21:18 |
6 hours, 48 minutes |
Installed two DC-to-DC converter units atop the station's Z1 Truss. | |||||
10. | STS-92 † |
Michael E. Lopez-Alegria Peter J.K. Wisoff |
October 18, 2000 15:00 |
October 18, 2000 21:56 |
6 hours, 56 minutes |
Removed a grapple fixture on the Z1 truss, deployed a Z1 utility tray, Manual Berthing Mechanism latches for Z1 were cycled and opened, and demonstrated the Simplified Aid for EVA Rescue (SAFER) pack's abilities. | |||||
11. | STS-97 † |
Joseph R. Tanner Carlos I. Noriega |
December 3, 2000 18:35 |
December 4, 2000 02:08 |
7 hours, 33 minutes |
Attached the P6 truss to the Z1 Truss, and prepared the solar arrays for deployment. Prepared the radiator for the power system deployment. | |||||
12. | STS-97 † |
Joseph R. Tanner Carlos I. Noriega |
December 5, 2000 17:21 |
December 5, 2000 23:58 |
6 hours, 37 minutes |
Configured the space station to use power from the P6. Positioned the S-band antenna for use by the space station. Prepared the station for the arrival of the U. S. Laboratory, Destiny. | |||||
13. | STS-97 † |
Joseph R. Tanner Carlos I. Noriega |
December 7, 2000 16:13 |
December 7, 2000 21:23 |
5 hours, 10 minutes |
Positioned a floating potential probe to measure the plasma field surrounding the space station, performed repair work to increase tension in the starboard solar array blankets that did not stretch out completely during deployment, and installed a centerline camera cable outside the Unity node. |
Read more about this topic: List Of International Space Station Spacewalks