Leningrad Class Destroyer - Construction

Construction

Building times for these ships was absurdly long, not least due to mismanagement. Many delays were caused by the armament and the turbines, neither of which was ready for production when Leningrad was laid-down. The new turbines entered production after the Leningrad was launched, but the new guns which didn't even enter into production until three years after that. Additional problems were caused by the large numbers of defective parts, some items reaching a 90% rejection rate. Unusually for Soviet ships of the interwar period, the Leningrads were not overweight.

Both Baku and Tblisi were assembled at Komsomolsk-on-Amur from parts provided by the shipyard at Nikolayev.

Read more about this topic:  Leningrad Class Destroyer

Famous quotes containing the word construction:

    There’s no art
    To find the mind’s construction in the face.
    William Shakespeare (1564–1616)

    No construction stiff working overtime takes more stress and straining than we did just to stay high.
    Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)

    Striving toward a goal puts a more pleasing construction on our advance toward death.
    Mason Cooley (b. 1927)