Lehigh Crane Iron Company - Early Years

Early Years

Construction of the first furnace commenced about August 1, 1839, at Biery's Port, later Catasauqua. The ovens for the hot blast were coal-fired, and the blowing engine was driven by a waterwheel tapping the canal at Lock 36. The furnace was blown in on July 3, 1840 and the first four tons of iron produced July 4, 1840. It remained in blast until flooded by a January freshet in 1841, producing 1,080 tons of iron during that period.

No. 2 Furnace was erected in 1842, using waste gas from the stack to heat the blast instead of coal-fired ovens. No. 3 was built in 1846, and Nos. 4 and 5 in 1849, as the iron business increased.

The limestone flux for the furnaces was largely shipped from local quarries. A mixture of about 75% limonite and 25% magnetite ore was used to supply the furnace. Most of the limonite was mined locally: the first batch of ore smelted at the furnace was supplied by Henry Hoch's mine (also referred to as Rice's mine) in Schoenersville nearby, and the mine was an important supplier of the ironworks for years, being worked from 1840 to 1908. Some magnetite came from the Wieand mine (also referred to as the Mann mine) at Vera Cruz, but it was principally shipped from the Irondale-area, Byram, and Dickerson Mines in New Jersey. Anthracite came from the LC&N's mines, shipped by canal boat for many years, and later by rail.

Read more about this topic:  Lehigh Crane Iron Company

Famous quotes related to early years:

    I believe that if we are to survive as a planet, we must teach this next generation to handle their own conflicts assertively and nonviolently. If in their early years our children learn to listen to all sides of the story, use their heads and then their mouths, and come up with a plan and share, then, when they become our leaders, and some of them will, they will have the tools to handle global problems and conflict.
    Barbara Coloroso (20th century)