Lean Construction - Integrated Lean Project Delivery (ILPD)

Integrated Lean Project Delivery (ILPD)

ILPD is a multi-party contract that specifies the use of lean practices as conceived in the Lean Project Delivery System. This distinction is needed because Integrated Project Delivery (IPD) is now only referring to the multi-party agreement regardless of what practices are used, the so called IPD-lite or IPD-ish. Boldt Construction describes ILPD succinctly in this YouTube video.

Read more about this topic:  Lean Construction

Famous quotes containing the words integrated, lean, project and/or delivery:

    Science is intimately integrated with the whole social structure and cultural tradition. They mutually support one other—only in certain types of society can science flourish, and conversely without a continuous and healthy development and application of science such a society cannot function properly.
    Talcott Parsons (1902–1979)

    You are the one
    Solid the spaces lean on, envious.
    You are the baby in the barn.
    Sylvia Plath (1932–1963)

    Although I mean it, and project the meaning
    As hard as I can into its brushed-metal surface,
    It cannot, in this deteriorating climate, pick up
    Where I leave off.
    John Ashbery (b. 1927)

    There was no speculation so promising, or at the same time so praisworthy, as the United Metropolitan Improved Hot Muffin and Crumpet Baking and Punctual Delivery Company.
    Charles Dickens (1812–1870)