Lean Construction - Differences Between Lean Construction Approach and Project Management Institute (PMI) Approach

Differences Between Lean Construction Approach and Project Management Institute (PMI) Approach

The differences between and PMI approach are listed below:

  • Managing the interaction between activities and combined effects of dependence and variation, is a first concern in lean construction because their interactions highly affects the time and cost of projects(Howell,1999);in comparison, these interactions are not considered in PMI.
  • In lean construction optimization efforts focus on making work flow reliable (Ballard, LPDS,2000 ); in contrast PMI focuses on improving productivity of each activity which can make errors and reducing quality and result in rework.
  • The project is structured and managed as a value generating process (value is defined as satisfying customer requirements) (Howell, 1999), while PMI considers less cost as value.
  • In lean approach, downstream stakeholders are involved in front end planning and design through cross functional teams (Ballard, LPDS, 2000); on the other hand PMI doesn’t consider this issue.
  • In lean construction, project control has the job of execution (Ballard, PhD thesis, 2000); whereas, control in PMI method relies on variance detection after-the-fact.
  • In lean method, pull techniques are used to govern the flow of materials and information through networks of cooperating specialists (Ballard, PhD thesis, 2000); in contrast, PMI uses push techniques for releasing the information and materials.
  • Capacity and inventory buffers are used to absorb variation(Mura). Feedback loops are included at every level, to make rapid system adjustments, (Ballard, PhD thesis, 2000); in comparison, PMI doesn’t consider adjustments.
  • Lean construction tries to mitigate variation in every aspect (product quality, rate of work) and manage the remaining variation, while PMI doesn’t consider variation mitigation and management. (Ballard, PhD thesis, 2000)
  • Lean approach tries to make continuous improvements in the process, workflows and product (Howell, 1999); whereas PMI approach doesn’t pay that much attention to continuous improvement.
  • In lean construction, decision making is distributed in design production control systems (Ballard, PhD thesis, 2000); by comparison, in PMI decision making is centered to one manager some times.
  • Lean construction tries to increase transparency between the stakeholders, mangers and labourers, in order to know the impact of their work on the whole project (Howell, 1999); on the other hand, PMI doesn’t consider transparency in its methods.
  • In lean construction a buffer of sound assignments is maintained for each crew or production unit (Ballard, PhD thesis, 2000); in contrast, PMI method doesn’t consider a backlog for crews.
  • Lean construction is developing new forms of commercial contracts to give incentives to suppliers for reliable work flow and optimization at the deliverable-to-the-client level (Howell, 1999); while PMI doesn’t have such policy.
  • Lean construction production system design resists the tendency toward local suboptimization. (Ballard thesis); however, PMI persists on optimizing each activity.
  • The PMI-driven approach only considers managing a project at the macro-level. This is necessary but not sufficient for the success of projects. Lean Construction encompasses Project and Production Management, and formally recognizes that any successful project undertaking will inevitably involve the interaction between project and production management. (Abdelhamid et al. 2008)

Read more about this topic:  Lean Construction

Famous quotes containing the words differences, lean, construction, approach, project, management and/or institute:

    I may be able to spot arrowheads on the desert but a refrigerator is a jungle in which I am easily lost. My wife, however, will unerringly point out that the cheese or the leftover roast is hiding right in front of my eyes. Hundreds of such experiences convince me that men and women often inhabit quite different visual worlds. These are differences which cannot be attributed to variations in visual acuity. Man and women simply have learned to use their eyes in very different ways.
    Edward T. Hall (b. 1914)

    You’d be so lean that blasts of January
    Would blow you through and through.
    William Shakespeare (1564–1616)

    Striving toward a goal puts a more pleasing construction on our advance toward death.
    Mason Cooley (b. 1927)

    Let me approach at least, and touch thy hand.
    [Samson:] Not for thy life, lest fierce remembrance wake
    My sudden rage to tear thee joint by joint.
    At distance I forgive thee, go with that;
    Bewail thy falsehood, and the pious works
    It hath brought forth to make thee memorable
    Among illustrious women, faithful wives:
    Cherish thy hast’n’d widowhood with the gold
    Of Matrimonial treason: so farewel.
    John Milton (1608–1674)

    The candidate tells us we are the “backbone of the State,” and we know that it is true, not because we are possessed of certain endowed virtues, but because we are a majority and have the vote.
    —Federal Writers’ Project Of The Wor, U.S. public relief program (1935-1943)

    This we take it is the grand characteristic of our age. By our skill in Mechanism, it has come to pass, that in the management of external things we excel all other ages; while in whatever respects the pure moral nature, in true dignity of soul and character, we are perhaps inferior to most civilised ages.
    Thomas Carlyle (1795–1881)

    Whenever any form of government shall become destructive of these ends, it is the right of the people to alter or to abolish it, & to institute new government, laying it’s foundation on such principles & organising it’s powers in such form, as to them shall seem most likely to effect their safety & happiness.
    Thomas Jefferson (1743–1826)