LCROSS - Spacecraft

Spacecraft

The LCROSS mission took advantage of the structural capabilities of the Evolved Expendable Launch Vehicle (EELV) Secondary Payload Adapter (ESPA) ring used to attach LRO to the Centaur upper stage rocket. Mounted on the outside of the ESPA were six panels that hold the spacecraft's science payload, command and control systems, communications equipment, batteries, and solar panels. A small monopropellant propulsion system was mounted inside of the ring. Also attached were two S Band omnidirectional antennas and two medium-gain antennas. The mission's strict schedule, mass, and budget constraints posed difficult challenges to engineering teams from NASA Ames Research Center (ARC) and Northrop Grumman. Their creative thinking led to a unique use of the ESPA ring and innovative sourcing of other spacecraft components. Usually, the ESPA ring is used as a platform to hold six small deployable satellites; for LCROSS, it became the backbone of the satellite, a first for the ring. LCROSS also took advantage of commercially available instruments and used many of the already-flight-verified components used on LRO.

LCROSS is managed by NASA's ARC and was built by Northrop Grumman. The LCROSS preliminary design review was completed on September 8, 2006. The LCROSS mission passed its Mission Confirmation Review on February 2, 2007, and its Critical Design Review on February 22, 2007. After assembly and testing at Ames, the instrument payload, provided by Ecliptic Enterprises Corporation, was shipped to Northrop Grumman on January 14, 2008, for integration with the spacecraft. LCROSS passed its review on February 12, 2009.

Read more about this topic:  LCROSS