Headbolt Lane and Planned Extension
As part of the second Merseyside Local Transport Plan (covering expansion of public transport in the region from 2006 to 2011), plans were drawn up for the possible future expansion of the electrified line beyond the existing station. Since the existing track at Kirkby station makes interchange difficult, part of the expansion involves the construction of a new station in the Northwood area of the town. This new facility, at Headbolt Lane - previously planned in the early 1970s but never built - would provide "turn-back" platforms for both diesel and electric services (likely in an island platform configuration). Exploratory technical assessments have already been carried out, and more detailed exploration of the scheme is scheduled to take place.
Read more about this topic: Kirkby Railway Station
Famous quotes containing the words lane, planned and/or extension:
“Making the best of things is ... a damn poor way of dealing with them.... My whole life has been a series of escapes from that quicksand [ellipses in source].”
—Rose Wilder Lane (18861968)
“Now the birth of Jesus the Messiah took place in this way. When his mother Mary had been engaged to Joseph, but before they lived together, she was found to be with child from the Holy Spirit. Her husband Joseph, being a righteous man and unwilling to expose her to public disgrace, planned to dismiss her quietly.”
—Bible: New Testament, Matthew 1:18,19.
“Tis the perception of the beautiful,
A fine extension of the faculties,
Platonic, universal, wonderful,
Drawn from the stars, and filtered through the skies,
Without which life would be extremely dull.”
—George Gordon Noel Byron (17881824)