Headbolt Lane and Planned Extension
As part of the second Merseyside Local Transport Plan (covering expansion of public transport in the region from 2006 to 2011), plans were drawn up for the possible future expansion of the electrified line beyond the existing station. Since the existing track at Kirkby station makes interchange difficult, part of the expansion involves the construction of a new station in the Northwood area of the town. This new facility, at Headbolt Lane - previously planned in the early 1970s but never built - would provide "turn-back" platforms for both diesel and electric services (likely in an island platform configuration). Exploratory technical assessments have already been carried out, and more detailed exploration of the scheme is scheduled to take place.
Read more about this topic: Kirkby Railway Station
Famous quotes containing the words lane, planned and/or extension:
“The dusk runs down the lane driven like hail;
Far off a precise whistle is escheat
To the dark; and then the towering weak and pale....”
—Allen Tate (18991979)
“Every day care center, whether it knows it or not, is a school. The choice is never between custodial care and education. The choice is between unplanned and planned education, between conscious and unconscious education, between bad education and good education.”
—James L. Hymes, Jr. (20th century)
“A dense undergrowth of extension cords sustains my upper world of lights, music, and machines of comfort.”
—Mason Cooley (b. 1927)