King's Cross Fire - Aftermath

Aftermath

The ticket hall and platforms for the Metropolitan line were undamaged and reopened the morning after the fire; the Victoria line, its escalators only slightly damaged, resumed normal operation on the following Tuesday. The ticket hall for the three tube lines was reopened in stages over a period of four weeks. The three escalators for the Piccadilly line had to be completely replaced, the new ones being commissioned on 27 February 1989, more than 16 months after the fire. Until that time, the only access to the Piccadilly line was via the Victoria line or Midland City platforms, and at peak hours was possible in one direction only.

Access to the Northern line platforms was indirect, its escalators connecting with the Piccadilly line. As the traffic from all three tube lines would have overcrowded the Victoria line escalators, Northern line trains ran through without stopping until repairs were complete. The nearly life-expired Northern line escalators were replaced as well and the Northern line station reopened, completing the return to normal operation, on 5 March 1989.

Read more about this topic:  King's Cross Fire

Famous quotes containing the word aftermath:

    The aftermath of joy is not usually more joy.
    Mason Cooley (b. 1927)