Power Projects in Karnataka
KPCL has 34 dams(Including the main, pickup and saddle dams) and 24 power stations across the State with power production capabilities ranging from 0.35 MW to 1035 MW. The total installed capacity of KPCL is 5975.91 MW. The corporation has its thermal power station at Raichur. And one more thermal project at Bellary of 500MW station. The installed capacity of the thermal power station is 1470 MW (210 MW x 7 units). The total gross power generation per annum is in the order of 10,362 GW·h at a plant load factor (PLF) 80% and 11,589 GW·h at a plant load factor of 90%. The corporation inorder to increase generation has planned 2 additional units in Bellary. One unit is ready. It is awaiting coal allocation from centeral Government
Read more about this topic: Karnataka Power Corporation Limited
Famous quotes containing the words power and/or projects:
“Without the power of the Industrial Union behind it, Democracy can only enter the State as the victim enters the gullet of the Serpent.”
—James Connolly (18701916)
“But look what we have built ... low-income projects that become worse centers of delinquency, vandalism and general social hopelessness than the slums they were supposed to replace.... Cultural centers that are unable to support a good bookstore. Civic centers that are avoided by everyone but bums.... Promenades that go from no place to nowhere and have no promenaders. Expressways that eviscerate great cities. This is not the rebuilding of cities. This is the sacking of cities.”
—Jane Jacobs (b. 1916)