Interstate 95 in Virginia - HOV Facilities

HOV Facilities

Interstate 95 extends the twin-lane barrier-separated HOV Lanes that begin on I-395 at the 14th Street Bridge in Washington. These lanes have been extended several times, most recently to just south of Woodbridge.

As part of the Quantico Creek bridge rebuilding project, a currently unused three-lane 300-foot (91 m) long bridge was constructed in the median just south of the southern HOV terminus for use if and when the HOV facilities are extended. It was previously used as a detour bridge and retains its lane striping from such use.

The new I-95 HOV/HOT lanes project will create approximately 29 miles (47 km) of HOV/HOT lanes on I-95 from Garrisonville Road in Stafford County to the vicinity of Edsall Road on I-395 in Fairfax County and includes: Constructing two new reversible HOV/HOT lanes for 9 miles (14 km) from Route 610/Garrisonville Road in Stafford County to Route 234 in Dumfries, where the existing HOV lanes begin. Widening the existing HOV lanes from two lanes to three lanes for 14 miles (23 km) from the Prince William Parkway to approximately 2 miles (3.2 km) north of the Springfield Interchange in the vicinity of Edsall Road. Making improvements to the existing two HOV lanes for 6 miles (9.7 km) from Route 234 to the Prince William Parkway. Adding new or improved access points in the areas of Garrisonville Road, Joplin Road, Prince William Parkway, Fairfax County Parkway, Franconia-Springfield Parkway, I-495 and in the vicinity of Edsall Road. The new HOV/HOT lanes project will no longer include the originally planned construction of 6 miles (9.7 km) of HOV/HOT lanes on I-395 in Alexandria or Arlington County or upgrades to key interchanges at Shirlington and Eads Street in Arlington County. Those lanes will continue to be restricted to HOV, transit, eligible hybrids and motorcycles during rush hours. However, VDOT is advancing plans to construct a new ramp at I-395 and Seminary Road for the Mark Center, concurrent with the HOV/HOT lanes project. The ramp will be open to HOV and transit only. Construction on the ramp could begin as early as 2012.VDOT will also expand park-and-ride lots and fund other local transit improvements to maximize the benefit of the new HOV/HOT lanes network. Construction of the 14-mile HOT lanes project on I-495 is more than 50 percent complete and the lanes will open to traffic by early 2013. VDOT is also advancing studies to support the ultimate extension of HOV/HOT lanes on I-95 south of Route 610 into Spotsylvania County.

Read more about this topic:  Interstate 95 In Virginia

Famous quotes containing the word facilities:

    I have always found that when men have exhausted their own resources, they fall back on “the intentions of the Creator.” But their platitudes have ceased to have any influence with those women who believe they have the same facilities for communication with the Divine mind as men have.
    Elizabeth Cady Stanton (1815–1902)