Confederation

Nevertheless, the geopolitical instability in North America resulting from the American Civil War led to increased nervousness on the part of British North American colonies, particularly wary of the large Union Army operating south of their borders. The demands for closer political and economic ties between colonies led to further calls for an "Intercolonial Railway". An 1862 conference in Quebec City led to an agreement on financing the railway with the Maritime colonies and Canada splitting construction costs and Britain assuming any debts, however the deal fell through within months.

It is speculated that this failure to achieve a deal on the Intercolonial in 1862, combined with the ongoing concerns over the American Civil War, led to the Charlottetown Conference in 1864, and eventually to Confederation of New Brunswick, Nova Scotia, and the Province of Canada (Ontario and Quebec) in 1867.

The British North America Act (BNA Act) of 1867 formally established an agreement calling for the construction of the Intercolonial Railway in Section 145:

145. Inasmuch as the Provinces of Canada, Nova Scotia, and New Brunswick have joined in a Declaration that the Construction of the Intercolonial Railway is essential to the Consolidation of the Union of British North America, and to the Assent thereto of Nova Scotia and New Brunswick, and have consequently agreed that Provision should be made for its immediate Construction by the Government of Canada; Therefore, in order to give effect to that Agreement, it shall be the Duty of the Government and Parliament of Canada to provide for the commencement, within Six Months after the Union, of a Railway connecting the River St. Lawrence with the City of Halifax in Nova Scotia, and for the Construction thereof without Intermission, and the Completion thereof with all practicable Speed.

Despite being enshrined in the BNA Act of 1867, it would still be another decade before a route was finally selected and construction was completed; however, as a start, the federal government assumed the operations of the NSR and E&NA which were to be wholly absorbed into the ICR. The route connecting the NSR and the E&NA was not contestable as the line had to cross the Cobequid Mountain range and the Isthmus of Chignecto where options were limited by the local topography. In New Brunswick, it was a different story, as the choice was narrowed to three options. A commission of engineers, headed by Sandford Fleming had been unanimously appointed in 1863 to consider the following:

  • The "Frontier Route"—surveyed in 1836 by Captain Yule (Royal Engineers) from Saint John, via Fredericton, up the Saint John River valley to Canada East, not far from the International Boundary which had been recently decided in favour of the United States during the Webster-Ashburton Treaty of 1842.
  • The "Central Route"—surveyor unknown, running north from a point near Sussex, passing near Grand Lake, and north to Canada East.
  • The "Chaleur Bay Route"—surveyed in the 1840s by Major Robinson (Royal Engineers), running from "The Bend" (Moncton), north to Newcastle on the Miramichi River, Bathurst and Campbellton, to Canada East. It would cross the Gaspé Peninsula using the Matapédia River valley before heading up the St. Lawrence River valley to the rail connection with the GTR at Rivière-du-Loup.

Despite pressure from commercial interests in the Maritimes and New England who wanted a rail connection closer to the border, the Chaleur Bay routing was chosen, amid the backdrop of the American Civil War, as it would keep the Intercolonial far from the boundary with Maine.