The lock underwent major repairs in 1998. It was closed for two months, forcing marine traffic to take an oft-used detour through Breton Sound near the mouth of the Mississippi River.

The $6 million project included $2 million in emergency repairs. The chamber was dewatered for the first time in 20 years, and concrete was replaced in portions of the chamber itself and in four of the eight valves. The valve mechanisms had suffered rust and corrosion and were replaced with stainless steel hardware.

Six of the ten original gates, fabricated around 1920 and weighing 250 tons apiece, were removed for sandblasting and replacement of weak spots. New seals and pintles were installed.

According to the U.S. Army Corps of Engineers website the lock was closed on 08/11/2008 for 60 days for repairs.