IEC 61850 - Related Standards

Related Standards

  • IEC 61850-7-410 — Hydroelectric Power Plants - Communication for monitoring and control.
  • IEC 61850-7-420 — Communications systems for Distributed Energy Resources (DER) - Logical nodes
  • IEC 61850-7-500 — Use of logical nodes to model functions of a substation Automation system.
  • IEC 61850-7-510 — Use of logical nodes to model functions of a Hydro Power Plant.
  • IEC 61850-90-1 — Use of IEC 61850 for the communication between substations
  • IEC 61850-90-2 — Use of IEC 61850 for the communication between control centres and substations
  • IEC 61850-90-3 — Using IEC 61850 for Condition Monitoring
  • IEC 61850-90-4 — IEC 61850 - Network Engineering Guidelines
  • IEC 61850-90-5 — Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118
  • IEC 61850-90-6 — Use of IEC 61850 for Distribution Feeder Automation System
  • IEC 61850-90-7 — Object Models for Photovoltaic,Storage and other DER inverters
  • IEC 61850-90-8 — Object Models for Electrical Transportation (E-Mobility
  • IEC 61850-90-9 — Object Models for Batteries
  • IEC 61850-90-10 — Object Models for Scheduling
  • IEC 61850-80-1 — Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104
  • IEC 61400-25 — IEC 61850 Adaptation for Wind Turbines
    • IEC 61400-25-1 — Wind turbines - Part 25-1: Communications for monitoring and control of wind power plants - Overall description of principles and models
    • IEC 61400-25-2 — Wind turbines - Part 25-2: Communications for monitoring and control of wind power plants - Information models
    • IEC 61400-25-3 — Wind turbines - Part 25-3: Communications for monitoring and control of wind power plants - Information exchange models
    • IEC 61400-25-4 — Wind turbines - Part 25-4: Communications for monitoring and control of wind power plants - Mapping to communication profile
      • Mapping to SOAP-based web services
      • Mapping to MMS
      • Mapping to OPC XML DA
      • Mapping to IEC 60870-5-104
      • Mapping to DNP3
    • IEC 61400-25-5 — Wind turbines - Part 25-5: Communications for monitoring and control of wind power plants - Conformance testing
    • IEC 61400-25-6 — Wind Turbines - Part 25-6: Communications for monitoring and control of wind power plants - Logical node classes and data classes for condition monitoring
  • IEC 62271-3 — Communications for monitoring and control of high-voltage switchgear (published)

Read more about this topic:  IEC 61850

Famous quotes containing the words related and/or standards:

    So-called “austerity,” the stoic injunction, is the path towards universal destruction. It is the old, the fatal, competitive path. “Pull in your belt” is a slogan closely related to “gird up your loins,” or the guns-butter metaphor.
    Wyndham Lewis (1882–1957)

    In full view of his television audience, he preached a new religion—or a new form of Christianity—based on faith in financial miracles and in a Heaven here on earth with a water slide and luxury hotels. It was a religion of celebrity and showmanship and fun, which made a mockery of all puritanical standards and all canons of good taste. Its standard was excess, and its doctrines were tolerance and freedom from accountability.
    New Yorker (April 23, 1990)