IEC 61511 covers the design and management requirements for SISs from cradle to grave. Its scope includes: initial concept, design, implementation, operation, and maintenance through to decommissioning. It starts in the earliest phase of a project and continues through startup. It contains sections that cover modifications that come along later, along with maintenance activities and the eventual decommissioning activities.

The standard consists of three parts:

  1. Framework, definitions, system, hardware and software requirements
  2. Guidelines in the application of IEC 61511-1
  3. Guidance for the determination of the required safety integrity levels

ISA 84.01/IEC 61511 requires a management system for identified SIS. An SIS is composed of a separate and independent combination of sensors, logic solvers, final elements, and support systems that are designed and managed to achieve a specified safety integrity level (SIL). An SIS may implement one or more safety instrumented functions (SIFs), which are designed and implemented to address a specific process hazard or hazardous event. The SIS management system should define how an owner/operator intends to assess, design, engineer, verify, install, commission, validate, operate, maintain, and continuously improve their SIS. The essential roles of the various personnel assigned responsibility for the SIS should be defined and procedures developed, as necessary, to support the consistent execution of their responsibilities.

ISA 84.01/IEC 61511 uses an order of magnitude metric, the SIL, to establish the necessary performance. A hazard and risk analysis is used to identify the required safety functions and risk reduction for specified hazardous events. Safety functions allocated to the SIS are safety instrumented functions; the allocated risk reduction is related to the SIL. The design and operating basis is developed to ensure that the SIS meets the required SIL. Field data are collected through operational and mechanical integrity program activities to assess actual SIS performance. When the required performance is not met, action should be taken to close the gap, ensuring safe and reliable operation.

Read more about this topic:  IEC 61511

Famous quotes containing the word standard:

    An indirect quotation we can usually expect to rate only as better or worse, more or less faithful, and we cannot even hope for a strict standard of more and less; what is involved is evaluation, relative to special purposes, of an essentially dramatic act.
    Willard Van Orman Quine (b. 1908)

    Error is a supposition that pleasure and pain, that intelligence, substance, life, are existent in matter. Error is neither Mind nor one of Mind’s faculties. Error is the contradiction of Truth. Error is a belief without understanding. Error is unreal because untrue. It is that which seemeth to be and is not. If error were true, its truth would be error, and we should have a self-evident absurdity—namely, erroneous truth. Thus we should continue to lose the standard of Truth.
    Mary Baker Eddy (1821–1910)