HSC Hellenic Wind - Atlantico Line

Atlantico Line

Viking was expected to depart from Liverpool for her Azores charter to Atlantico Line around 5–6 July. A side-loading door that was fabricated in Portsmouth was fitted. She did not leave until 23 July due to a leak that was found when her fuel tanks were being filled for her long voyage. The port side of Viking has lost the web address, “steam-packet.com” due to re-painting following the insertion of the side-loading vehicle door. During the voyage her hull was damaged due to weather and docked at Falmouth, Cornwall for repairs. She finally arrived in the Azores and began service on the morning of 5 August. Steam Packet masters were believed to be accompanying the ship for training purposes and then to act as the representatives.

Read more about this topic:  HSC Hellenic Wind

Famous quotes containing the word line:

    There’s a line between love and fascination that’s hard to see on an evening such as this.
    Ned Washington (1901–1976)