Basic Data
- Operators, distances
- West Japan Railway Company (Services and tracks)
- Japan Freight Railway Company (Services)
- From Maibara to Naoetsu: 353.8 km / 219.8 mi.
- Japan Freight Railway Company (Services and tracks)
- From Tsuruga to Tsuruga-minato: 2.7 km / 1.7 mi.
- Stations:
- Passenger stations: 78, including those with freight services
- Freight terminals: 4
- Double-track line: From Maibara to Naoetsu
- Electric supply: From Maibara to Naoetsu
- From Maibara to Tsuruga: 1,500 V DC
- From Tsuruga to Itoigawa: 20,000 V AC, 60 Hz
- From Itoigawa to Naoetsu: 1,500 V DC
- Railway signalling:
- From Maibara to Naoetsu: Automatic train control
- From Tsuruga to Tsuruga-minato: Token system
- Maximum line speed: 130 km/h
- CTC center:
- From Maibara to Ōmi-Shiotsu: Shin-Ōsaka Operation Control Center
- From Ōmi-Shiotsu to Naoetsu: Kanazawa Operation Control Center
- CTC system:
- From Maibara to Ōmi-Shiotsu: Safety Urban Network Traffic System (SUNTRAS)
Read more about this topic: Hokuriku Main Line
Famous quotes containing the words basic and/or data:
“Southerners, whose ancestors a hundred years ago knew the horrors of a homeland devastated by war, are particularly determined that war shall never come to us again. All Americans understand the basic lessons of history: that we need to be resolute and able to protect ourselves, to prevent threats and domination by others.”
—Jimmy Carter (James Earl Carter, Jr.)
“To write it, it took three months; to conceive it three minutes; to collect the data in itall my life.”
—F. Scott Fitzgerald (18961940)