Hokuriku Main Line - Basic Data

Basic Data

  • Operators, distances
    • West Japan Railway Company (Services and tracks)
    • Japan Freight Railway Company (Services)
      • From Maibara to Naoetsu: 353.8 km / 219.8 mi.
    • Japan Freight Railway Company (Services and tracks)
      • From Tsuruga to Tsuruga-minato: 2.7 km / 1.7 mi.
  • Stations:
    • Passenger stations: 78, including those with freight services
    • Freight terminals: 4
  • Double-track line: From Maibara to Naoetsu
  • Electric supply: From Maibara to Naoetsu
    • From Maibara to Tsuruga: 1,500 V DC
    • From Tsuruga to Itoigawa: 20,000 V AC, 60 Hz
    • From Itoigawa to Naoetsu: 1,500 V DC
  • Railway signalling:
    • From Maibara to Naoetsu: Automatic train control
    • From Tsuruga to Tsuruga-minato: Token system
  • Maximum line speed: 130 km/h
  • CTC center:
    • From Maibara to Ōmi-Shiotsu: Shin-Ōsaka Operation Control Center
    • From Ōmi-Shiotsu to Naoetsu: Kanazawa Operation Control Center
  • CTC system:
    • From Maibara to Ōmi-Shiotsu: Safety Urban Network Traffic System (SUNTRAS)

Read more about this topic:  Hokuriku Main Line

Famous quotes containing the words basic and/or data:

    ... the basic experience of everyone is the experience of human limitation.
    Flannery O’Connor (1925–1964)

    To write it, it took three months; to conceive it three minutes; to collect the data in it—all my life.
    F. Scott Fitzgerald (1896–1940)