HMS Mermaid (1782) - Design and Construction

Design and Construction

Mermaid was one of the eight ship Active class, designed by Edward Hunt. She was initially ordered from the shipwright George White, of Woolwich Dockyard Shipwright on 27 August 1778, and laid down in September 1778, but the order moved to John Jenner in April 1779. On 21 March 1782 the order was canceled and moved instead to Thomas Pollard, at Sheerness Dockyard, and the frigate was again laid down, on 29 July 1782. She was launched on 29 November 1782, and commissioned for the ordinary on 30 December 1784. She was commissioned again between June and August 1790 for sea. She had cost £12,854 to build, with another £2,539 paid for her fitting out in 1790. The Woolwich work had cost £1,807.

Read more about this topic:  HMS Mermaid (1782)

Famous quotes containing the words design and/or construction:

    A good scientist is a person with original ideas. A good engineer is a person who makes a design that works with as few original ideas as possible. There are no prima donnas in engineering.
    Freeman Dyson (b. 1923)

    There’s no art
    To find the mind’s construction in the face:
    He was a gentleman on whom I built
    An absolute trust.
    William Shakespeare (1564–1616)