Construction and Modifications
She was laid down by Vickers-Armstrong at Barrow-in-Furness during WW II as HMS Elephant. Construction was suspended in 1945 but work was resumed in 1952 to clear the slipway and the hull was launched on 16 February 1953. The vessel remained unfinished until 1957, when she entered service on 18 November 1959 as HMS Hermes after extensive modifications which included installation of a massive Type 984 'searchlight' 3D radar.
Hermes initially operated Supermarine Scimitar, de Havilland Sea Vixen, and Fairey Gannet fixed-wing aircraft, together with Westland Whirlwind helicopters.
Read more about this topic: HMS Hermes (R12)
Famous quotes containing the word construction:
“There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.”
—John Dewey (18591952)