Construction
Gwadar Port was developed by the Government of Pakistan at a cost of USD $248 million. The construction contract was awarded to a Chinese firm and construction began on 22 March 2002 and Phase I (see below) of the Port was completed in December 2006 and inaugurated by the President of Pakistan on 20 March 2007.
Gwadar Port is being constructed in two phases:
Phase I (2002-2006): USD $248 million. Status: Completed in December 2006
- Berths: 3 Multipurpose Berths (capacity: bulk carriers of 30,000 deadweight tonnage (DWT)) and container vessels of 25,000 DWT)
- Length of Berths: 602m
- Approach Channel: 4.5 km long dredged to 12.5m depth
- Turning basin: 450m diametre
- Service Berth: One 100m Service Berth
- Related port infrastructure and handling equipment, pilot boats, tugs, survey vessels, etc.
Phase II (2007-present): USD $932 million. Status: Under Construction
- 4 Container Berths
- 1 Bulk Cargo Terminal (capacity: 100,000 DWT ships)
- 1 Grain Terminal
- 1 Ro-Ro Terminal
- 2 Oil Terminals (capacity: 200,000 DWT ships each)
- Approach Channel: To be dredged to 14.5m depth
Read more about this topic: Gwadar Port
Famous quotes containing the word construction:
“No real vital character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the authors personality, developing by internal necessity as much as by external addition.”
—T.S. (Thomas Stearns)
“There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.”
—John Dewey (18591952)
“The construction of life is at present in the power of facts far more than convictions.”
—Walter Benjamin (18921940)