Great Eastern Main Line - Proposed Developments

Proposed Developments

The Greater Anglia RUS, published in December 2007 outlines a number of developments intended for the Great Eastern route. Other proposals have been announced separately.

  • 68 additional carriages to provide longer trains will be introduced between December 2009 and December 2011.
  • Extension of platform 10A at Stratford to increase peak flow and capacity during the period 2009-2014.
  • Additional path on the Colchester, Chelmsford and Southend routes during the period 2009-2014.
  • A turn-back facility at Chadwell Heath during the period 2009-2014.
  • A new station at Great Blakenham as part of the SnOasis development near Ipswich, which received its final go-ahead on 6 November 2008.
  • In 2014 the 'Shenfield Metro' service will be absorbed managed by Crossrail and it will form part of its cross-London service from 2018.

Read more about this topic:  Great Eastern Main Line

Famous quotes containing the words proposed and/or developments:

    ...a fixed aim furnishes us with a fixed measure, by which we can decide whether such or such an action proposed is worth trying for or not, and as aims must vary with the individual, the decisions of any two people as to the desirableness of an action may not be the same.
    Anna C. Brackett (1836–1911)

    The developments in the North were those loosely embraced in the term modernization and included urbanization, industrialization, and mechanization. While those changes went forward apace, the antebellum South changed comparatively little, clinging to its rural, agricultural, labor-intensive economy and its traditional folk culture.
    C. Vann Woodward (b. 1908)