History
In 1922, Energie Ouest Suisse (EOS) became established with a few small power stations. To generate substantial amount of electricity, EOS looked to the Valais canton which contains 56% of Switzerland's glaciers and stores the largest amount of water in Europe. In 1927, EOS acquired the license for the upper Dixence basin. In 1929, 1,200 workers constructed the first Dixence dam which would be complete in 1935. The first dam would supply water to the Chandoline Power Station which has a capacity of 120 MW.
After the Second World War, growing industries needed electricity and construction on the Cleuson Dam began in 1947 and was completed in 1951. Plans for the Super Dixence Dam were now being finalized by the recently founded company, Grande Dixence SA. Construction on the Super Dixence Dam soon began later in 1950. By 1964, 3,000 workers had finished pouring 6,000,000 m3 (210,000,000 cu ft) of concrete, completing the dam. The original Dixence dam was submerged by the filling of Lac des Dix beginning in 1957, it can still be seen when the reservoir level is low.
In the 1980s, Grande Dixence SA and EOS began the Cleuson-Dixence project which improved the quality of electricity produced by building new tunnels along with the Bieudron Power Station. By the time the Cleuson-Dixence Complex was complete, the power generated had more than doubled.
Read more about this topic: Grande Dixence Dam
Famous quotes containing the word history:
“English history is all about men liking their fathers, and American history is all about men hating their fathers and trying to burn down everything they ever did.”
—Malcolm Bradbury (b. 1932)
“Tell me of the height of the mountains of the moon, or of the diameter of space, and I may believe you, but of the secret history of the Almighty, and I shall pronounce thee mad.”
—Henry David Thoreau (18171862)
“The history of every country begins in the heart of a man or a woman.”
—Willa Cather (18761947)