Gentilly-1
Gentilly-1 was a prototype CANDU-BWR reactor, based on the SGHWR design. It was designed for a net output of 250MW(e). The reactor had several features unique amongst CANDU reactors, including vertically oriented pressure tubes (allowing for the use of a single fuelling machine below the core), and light-water coolant. These features were intended to reduce the cost and complexity of the unit, again to make it an attractive export unit. However, the design was not successful, and over nearly 7 years recorded only 180 on-power days. Gentilly-1 is no longer in operation.
Read more about this topic: Gentilly Nuclear Generating Station