Geislinger Steige - Future

Future

The top speed on the ramp is 70 km/h. Trains with uncoupled banking engines climb the ramp at 60 km/h. In order to get rid of the bottleneck at Geislinger Steige a new high-speed line is being planned: the Wendlingen–Ulm high-speed railway, for speeds up to 250 km/h. It is intended to get round the height difference at Geislingen using two tunnels, each 8 km long. The still-outstanding financial risk cover was sorted out in July 2007. On the down side, plans for other sections of the new line have still not been finalised.

Due to the steepness of the new line heavy trains will not be permitted to use it. As a result pusher services on the Geislinger Steige, which have been going for 150 years, will continue to be needed.

Read more about this topic:  Geislinger Steige

Famous quotes containing the word future:

    I say—the future is a serious matter—
    And so—for God’s sake—hock and soda-water!
    George Gordon Noel Byron (1788–1824)

    I will be steel!
    I will build a steel bridge over my need!
    I will build a bomb shelter over my heart!
    But my future is a secret.
    It is as shy as a mole.
    Anne Sexton (1928–1974)

    The difference between Pound and Whitman is not between the democrat who in deep distress could look hopefully toward the future and the fascist madly in love with the past. It is that between the woodsman and the woodcarver. It is that between the mystic harking back to his vision and the artist whose first allegiance is to his craft, and so to the reality it presents.
    Babette Deutsch (1895–1982)