Development History
As planned, FCS included the network; unattended ground sensors (UGS); unmanned aerial vehicles (UAVs); unmanned ground vehicles; and the eight manned ground vehicles.
The Boeing Company and Science Applications International Corporation (SAIC) worked together as the lead systems integrator, coordinating more than 550 contractors and subcontractors in 41 states.
A spiral model was planned for FCS development and upgrades. As of 2004, FCS was in the System Development and Demonstration (SDD) phase, which included four two-year spirals. Spiral 1 was to begin fielding in Fiscal Year 2008 and consist of prototypes for use and evaluation. Following successful evaluation, production and fielding of Spiral 2 would have commenced in 2010. The evaluation was conducted by the Army Evaluation Task Force (AETF), previously known as Evaluation Brigade Combat Team (EBCT), stationed in Fort Bliss. As of December 2007, AETF consisted of 1,000 soldiers from the 1st Armored Division.
In August 2005, the program met 100% of the criteria in its most important milestone to date, Systems of Systems Functional Review. On October 5, 2005, Pentagon team recommended "further delaying the Army's Future Combat Systems program" in light of the costs of the Iraq War, Hurricane Katrina, and expected declines in future budgets.
The Pentagon announced plans in January 2006 to cut $236 million over five years from the $25 billion FCS 2007-2011 budget. The entire program was expected to cost $340 billion. As of late December 2006, funding was scaled back for critical elements of the overall FCS battlespace, and the most advanced elements were deferred.
The program had completed about one-third of its development as of 2008, which had been planned to run through 2030. Technical field tests began in 2008. The first combat brigade equipped with FCS had been expected to roll out around 2015, followed by full production to equip up to 15 brigades by 2030. However, the program had not met the initial 2004 plan of fielding the first FCS-equipped unit in 2008.
On April 6, 2009, President Barack Obama's Secretary of Defense, Robert Gates announced plans to cut FCS spending as part of a shift toward spending more on counter-terrorism and less to prepare for conventional warfare against large states like China and Russia. This included, but was not limited to, cancelling the series of Manned Ground Vehicles.
In May 2009, the proposed DoD budget for fiscal year 2010 has minimal funding for Manned Ground Vehicles research. The Army plans to restart from the beginning on manned ground vehicles. The service is to restructure FCS so more Army units will be supported.
The DoD released a memorandum on 23 June 2009 that cancelled the Future Combat Systems program and replaced it with separate programs under the Army Brigade Combat Team Modernization umbrella to meet the Army's plans.
Read more about this topic: Future Combat Systems
Famous quotes containing the words development and/or history:
“The work of adult life is not easy. As in childhood, each step presents not only new tasks of development but requires a letting go of the techniques that worked before. With each passage some magic must be given up, some cherished illusion of safety and comfortably familiar sense of self must be cast off, to allow for the greater expansion of our distinctiveness.”
—Gail Sheehy (20th century)
“To care for the quarrels of the past, to identify oneself passionately with a cause that became, politically speaking, a losing cause with the birth of the modern world, is to experience a kind of straining against reality, a rebellious nonconformity that, again, is rare in America, where children are instructed in the virtues of the system they live under, as though history had achieved a happy ending in American civics.”
—Mary McCarthy (19121989)